Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Maintained by The Center

...

Construction units are unique.  They are only needed for doing new building construction and upgrades.  Note, that producing Construction units needs to be done in multiples of eight (8).  The cost of a bulldozer can cause your unit cost to be higher than normal.  Construction units need 0.125x Bulldozer. Meaning 8 construction units can be made from 1 Bulldozer. If, you made 1 construction unit the price of 1 full bulldozer would be used. If, you made 2 construction units the price of 1 full bulldozer will be split between the two. And so on all the way up to the correct amount of 8.

...

Level 5 Farm is (5 x $6,900) = $34,500
$34,500 is the total BV of a level 5 Farm.

Income Statement

When upgrading buildings the Construction Costs are defined as: “Value "lost" when upgrading over level 2 or due to overpriced construction materials”

This will show the Difference between Construction Costs and the Reference costs.

...

SCRAPPING

If a building is level 1 or 2, you will get the full investment back. Any building above level 2 that is scrapped will not receive the full investment back. Destroying a level 5 building will return 5 times the value of a level 1 building.

...

Library Guides:
Frequently Asked Questions (FAQ), Guide for Beginners, Research Guide, Executives Guide,
Government Orders Guide, Aerospace Guide

By The Center